2 Full Bathroom remodels in Calabasas

In Calabasas ,Ca we just started a job that will include 2 full bathrooms. First step was to prep the area we are working on so we can keep the house as clean as possible. Then we demoed that bathroom and we removed the following existing tile wall and tub, this includes the concrete, wire and paper. Tub surround, frame box and shower: existing control valve and shower head. The toilet, vanity faucets, existing floors and baseboard. There is also the mirror, medicine cabinet, existing outlets, shower enclosed and vanity cabinet.

Related Posts